Saturday, December 28, 2019

Design Concept Requirements And Needs - 1460 Words

DESIGN CONCEPT Requirements needs Designing a building that evokes attraction and curiosity among public, the aim is to create interest in the stem cell research while introducing the technology to South Africa. The location of the building should be on an active node where people will be able to observe the building. The facility will be inviting to the public with exhibition space, public square, auditorium for medical conferences and house a cafe’ for the visitors and serve as a brake hub for scientist to cross exchange ideas. Opening the building for public use allows for transparency in the facility but yet it should be kept in mind to still maintain a controlled sterile environment. Urbanism The use of brownfield sites opens up new land within urban environments, but what if we can find an alternative to these sites for smaller developments. Bridges and roadways are much needed for movement within a city, but waste vast amounts of habitable land and space. Is it possible to claim back sum of the land that this network of movement in our cities consume. Figure 1: The site Selecting the site to occupy the land underneath a road way using the leftover space that we cannot see or even know exist like Medical researchers have to uncover stem cells found in bone marrow and manipulate them. The site can duplicate this process by ground works uncover the site and disrupting the existing structure of the bridge. This allows the designer toShow MoreRelatedDesign Concept : Requirements And Needs1618 Words   |  7 Pages DESIGN CONCEPT Requirements needs In designing a building that evokes attraction and curiosity among public, the aim is to create interest in the stem cell research while introducing the technology to South Africa. The location of the building should be on an active node where people will be able to observe the building. The facility will be inviting to the public with exhibition space, public square, auditorium for medical conferences and house a cafe’ for the visitors and serve as aRead MoreDesign And Develop The Hip Prosthesis With Cementless Fixation For Specific Breeds Of Dogs1481 Words   |  6 Pagesresearch aims to design and develop the hip prosthesis with cementless fixation for specific breeds of dogs. In order to find the solution systematically, several steps need to be taken as follows; 3.1 Data acquisition phase In this phase, it is necessary to study and investigate in depth in order to clarify what are the problems, the root causes and the requirements as well as other obligations. 3.2 Systematic design phase The result of the previous step will be extracted to many concepts for the solutionRead MoreRequirements Of Requirements And Requirements1431 Words   |  6 PagesQuestion 1: When writing a requirements document, it is important to understand what it is that you’re writing. Requirements documents must be hierarchical, and also must be consistent. Consistency is important, because one must be able to follow for whom he is defining requirements. System requirements vary significantly from stakeholder requirements. As the requirements are written, it is also important to maintain order along with consistency. If requirements are not ordered very specificallyRead MoreEssay on Intaraction of ENTJ (MBTI)1060 Words   |  5 Pagesinitially difficult. What will you do to bridge the gap in approaches so that, with some flexibility in the method of reaching the goal, both types can use their natural strengths? SDLC stage Extroverts Introverts Type Interaction Concept, High Level Requirements, Feasibility Analysis, Project Charter They try to get information from others. In this SDLC stage the communication is very important. Thus extroverts try to get information from others that is really important on this stage. TheyRead MoreThe Velocity Of Door Travel Essay853 Words   |  4 PagesOpening: Velocity of Door Travel: V=(Time to Open)(Distance Traveled)=(3.16 s)(1.25 m) = 0.40 m/s Power Requirement: P(W) =(Force Exerted)(Velocity) =(110 N)(0.40 m/s) = 43.56 W Translation to British Units: P (hp) =(43.56 W)(0.001341 hp/W) = 0.06 hp Closing: Velocity of Door Travel: V=(Time to Open)(Distance Traveled)=(2.12 s)(1.25 m) = 0.59 m/s Power Requirement: P(W) =(Force Exerted)(Velocity) =(540 N)(0.59 m/s) = 314.62 W Translation to British Units: P (hp) =(314.62 W)(0.001341 hp/W) = 0Read MorePrincipal Steps Of The Planning Phase1352 Words   |  6 Pagesthe project, the requirements are developed by the algorithmic approach of the project team. 2) Requirements Gathering ïÆ'Ëœ With the help of all the contributions of all the team members, a concept is developed for a new system. This new system concept is used as an origin to develop business analysis models which defines how a business will operate if a new system is originated. 3) System Proposal ïÆ'Ëœ System proposal is a document which comprises of analysis, models and system concept, which is usedRead MoreQuality Function Deployment1594 Words   |  6 Pagesensure the needs and satisfaction of customers can be achieved. There are various products on the market that have been produced with creativity and a uniquely distinctive and good functionality to attract customers to use it. To produce high quality products, there are several methods is used to study in detail the needs of customers today. One of the best methods is called Quality Function Deployment (QFD). QFD main focus is to meet the needs of customers as well as to understand their needs and toRead MorePhases, Steps, Techniques, And Deliverables1333 Words   |  6 Pagesdescribing the costs and benefits in each phase of Software Development Life Cycle. To execute each and every step in every phase we need to follow some of the techniques like getting known about the nature of the problem etc ,, and determining the organization’s objectives. This provides a general idea about shape of the new system. These are used as input to the design phase which refine them to produce a set of deliverables. These describes the detailed terms about how the system will be builtRead Moreâ€Å"Logical Design, Part 1† Essay1428 Words   |  6 Pagestwo to three page paper titled â€Å"Logical Design, Part 1† whereas I am a recently hired consultant for ACME Global Consulting to procure requirements for a large database. In this scenario, â€Å"Logical Design, Part 1†, I will develop a database management systems to convince a set of clients of the benefits of using the Entity–Relationship model (E-R) in developing a database. In addition, my management would like the following points addressed in my design: (1). List the advantages of a relationalRead MoreCareer Episode-2 . C.E.2.1 Introduction. C.E.2.1.1 Duration:1139 Words   |  5 Pagesbuilding and installing High Frequency Tube Mill in 3G Metal Corp. Bawal, Rewari from June 2015 to December 2015. C.E.2.2.2 NATURE OF OVERALL PROJECT: The overall project was to design, build and install the High Frequency Tube Mill for 3G Metal Corp. in Bawal, Rewari. C.E.2.2.3 OBJECTIVES OF THE PROJECT: - To design the Tube Mill flexible so that it can make round and square pipes in between 5/8 inches to 4 inches. -Complete the manufacturing and installation of the High Frequency Tube Mill for

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.